Finances
Financial Data on the Project's Capital Plan, Operations and Maintenance
Financial Plan
-
Financial Capacity Assessment for the Honolulu High Capacity Transit Corridor Project - Porter Report (1.25.2012)
This document presents a financial capacity assessment of the City & County of Honolulu (hereafter, "the City") in preparation for final design approval for the Honolulu High Capacity Transit Corridor Project, prepared for the Federal Transit Administration (Porter Report).
-
File size: 4 MB
-
HHCTCP Draft Financial Plan for Entry into Final Design (9.2011)
HHCTCP Draft Financial Plan for Entry into Final Design dated September 2011.
-
File size: 2 MB
-
HHCTCP Draft Financial Plan for Entry Into Final Design (4.2011)
The April 2011 Draft Financial Plan for Entry Into Final Design of the Project, which describes the Capital Plan, the Operating Plan, and a comprehensive analysis of mitigating strategies.
-
File size: 1 MB
-
Financial Plan for Entry Into Preliminary Engineering Submittal (Updated 8.2009)
The August 2009 revised financial plan for entry into Preliminary Engineering, which outlines the Capital Plan, the Operating Plan, a cash flow summary and demonstration of feasibility of the Financial Plan, and an analysis of risks and uncertainties.
-
File size: 1 MB
-
Summary Cash Flow Tables HHCTCP (8.10.2009)
Summary Cash Flow Tables HHCTCP (8.10.2009) as related to the financial plan.
-
File size: 25 KB